Detail: 3P, 380V, 50Hz 8.3 m / min Single Mast Climbing Work
Platform STC100 D Descrition: Mast climbing work platform is Shenxi' s newly-researched and
designed aerial work equipment, which adopts the latest
technological advances and develops on the basis of traditional
suspended access platform. It embodies lots of superior features
and does play an indispensable part in large-scale construction
work at height, especially in worksites where the suspending
mechanisms are unable to install. The main parts of Mast climbing work platform can be interchanged
with building hoist such as mast sections, rack, pinion, reducing
device and so on. And its width and length can be changed according
to requirement. It is requisite equipment in construction job.
Additionally. It is no need for foundation so that it is easy to
change the working site Specifications: - - - - | Single Mast | Double Mast | Rated Capacity | 1000 kg | 1700 kg | Rated Lifting Speed | 8.3 m/ min | Max. Working Height | 100 m | Max. Height of Stand-alone Installation | 7.5 m | Length of Platform | 8.67 m | 20.34 m | BasicWidth of Platform | 1.5 m | Max.Width of Platform | 2.5 m | Size of Standard Section | 1508500500 mm | Motor | Type | YZZ 132 S1-4 | Power | 25.5 kW | 45.5 kW | Rated Rotation Speed | 1400 r/ min | Rated current | 13.5 A | Brake | Brake Torque | 100 N.m | Exciter Voltage | DC 195 V | Reducer | Type | TU 65 C/ 125-63 | Transmission Ratio | 1: 63 / 1300 N.m | Power Supply | 3P, 380V, 50Hz | Total Weight( H100m) | 8724 kg | 17734 kg | - - - - Competitive Advantage: 1.with overload 2.with balance device 3.moving synchronize device 4.with anti-falling safety device 5.with constant speed safety device 6.with hand-operation landing equipment Model Number: STC100 Brand Name: SHENXI Payment Terms: T/ T & L/ C Minimum: Certification: CE & SGS Delivery Time: 15 working days Supply Ablity:
3P, 380V, 50Hz 8.3 m / min Single Mast Climbing Work Platform STC100 D Images